Project Details

Stoop Renovation

45 St. Paul’s Place Brooklyn NY 11226


Type of Work: Masonry Work

Year Completed: 2023-01-31


Front stoop to be demo. The install metal sheet and I beam. Then install plywood, felt paper and roof over the metal sheet. Then put wire mesh, and install 4’’ 4000 PSI concrete cement. then make a step with brick. After that apply a scratch coat, after dry apply final coat.

Before

Middle

Middle

Middle

After